Data Centre Modernization Delivers 50% Energy Savings
A major energy utility modernized their aging data centre infrastructure with AI-driven optimization, dramatically reducing energy consumption while improving system reliability.
The Challenge
The energy provider operated two aging data centres that were struggling to meet growing computational demands while consuming excessive power. As a company committed to sustainability, the irony of their inefficient data centres was not lost on leadership.
Key challenges included aging infrastructure approaching end-of-life, high power usage effectiveness (PUE) ratios, limited capacity for new workloads, and the need for 24/7 availability to support critical grid operations and customer services.
Our Solution
Caisa AI Technology designed and implemented a comprehensive data centre modernization program that consolidated infrastructure, implemented AI-driven cooling optimization, and introduced software-defined architecture.
"Caisa AI Technology helped us practice what we preach. Our new data centre is now a showcase for energy efficiency, and the AI-driven optimization continues to find savings we didn't know were possible. The transformation exceeded every expectation."— Operating Officer
The Results
The data centre modernization delivered exceptional results within the first year of operation:
- 50% reduction in energy consumption through AI-optimized cooling and efficient hardware
- 99.999% uptime exceeding Tier IV data centre standards
- substantial annual savings in operational and energy costs
- PUE reduced from 2.1 to 1.3 achieving industry-leading efficiency